top of page
20200605_124425.jpg
20200605_183419.jpg
IMG_20200613_114747_278.jpg

Power

30+ years ago the installation of the electrical utilities stopped rather than dig through the fragile road for 4/10ths of a mile.

 

SE was able to complete this project using the the Kaiser mobile walking excavators superior steep slope abilities in less than 400 feet. This project was performed for and with J.D. Thinning of Whitefish, Montana

Sewer

Changing sanitary regulations forced the new owners of this property to move the location of their leach field 700 feet down slope. Once again SE was able to complete this project using the the Kaiser mobile walking excavators superior steep slope abilities. This project was performed for Mindful Designs, Inc. of Whitefish, Montana

20201106_145637.jpg
20201103_121357.jpg

Nat. Gas, Power, Data, Low Volt

SE facilitated the installation of multiple utility services for an amazing new lake shore pavilion. Tasks included excavation, drain rock placement, removal and re-assembly of multiple dry stack walls and the placement of multiple cut stone stair treads. Utilization of the Holp tiltrotator was key to the success of this project.

Yep, Once again SE was able to complete this project using the the Kaiser mobile walking excavators superior steep slope abilities. This project was performed for Greenwood Masonry Construction of Whitefish, Montana.

20220511_112356.jpg
20220608_090607.jpg
20220525_122909.jpg
20220603_113206.jpg
bottom of page